What Should Boiler, Heat Pump or Solar Leads Cost?

What Should Boiler, Heat Pump or Solar Leads Cost?

13 October 2026

Two suppliers quote you £30 and £60 a lead. Which one is cheaper? It depends on how many of those leads become completed installations, not on the price per lead.

This guide shows you how to work backwards from a profitable installation to the most you can afford to pay. If you would like to see what that could look like for your own business, see how many leads we could generate for you.

What does a lead really cost?

A lead has four different costs, and only the last one tells you whether you are making money.

  • Cost per enquiry: what you pay for each person who asks for a quote. This is the headline price.
  • Cost per qualified enquiry: what you pay for each enquiry that fits your criteria, such as the right area, property type and a genuine intention to go ahead.
  • Cost per attended survey: what you pay for each survey where the customer is actually there and lets your surveyor in.
  • Cost per completed installation: your total lead spend divided by the installations you finish. This is the number that matters.

Ask every supplier for results at each stage, and check your own records for the same four numbers.

Are shared or exclusive leads cheaper?

Shared leads cost less per lead, but they are sold to more than one buyer, so you compete for the same customer. Exclusive leads cost more because only you receive the enquiry.

Neither is better by definition. What matters is how many of each type turn into completed installations at the price you paid. A shared lead that you call quickly can beat an exclusive lead that you leave for a day.

What other costs sit behind a lead?

The price of the lead is only part of what you spend to win an installation.

  • Advertising fees: if you run your own campaigns, the cost of clicks, agency or management fees and the landing page all count.
  • Sales time: every call, follow-up and quote takes time that someone is paid for.
  • Wasted surveys: a survey that goes nowhere still costs travel and time.

Why does each product need its own numbers?

Boilers, heat pumps and solar convert differently, so one set of assumptions for all three will mislead you.

  • Boilers: often an urgent purchase, so people may decide quickly.
  • Heat pumps: usually need a heat loss survey and a longer decision, and grant eligibility can affect the outcome.
  • Solar: depends on the roof and often on how the customer plans to pay.

Use your own lead to installation rate for each product, taken from real results, not from a general rule.

How do you work out the most you can afford to pay for a lead?

Start with the profit on a completed installation, take away what it costs to sell and survey, take away the profit you want to keep, and what is left is the most you can spend on leads for each installation. Then multiply by your lead to installation rate to get a price per lead.

  1. Start with gross profit. The price of the installation, less materials and labour.
  2. Subtract sales and survey costs. Include admin and your own team’s time.
  3. Subtract the profit you want to keep. What is left is your maximum lead spend per installation.
  4. Multiply by your lead to installation rate. That gives you the most you can pay for one lead.

Do not ask what a lead costs. Ask what an installation costs you.

What does that look like in practice?

Here is a simple example. These numbers are made up to show the method. They are not industry averages and they are not a claim about any supplier’s prices.

Supplier A Supplier B
Price per lead £30 £60
Leads bought 100 100
Total lead spend £3,000 £6,000
Completed installations 3 10
Lead to installation rate 3% 10%
Lead spend per installation £1,000 £600

Supplier A looks half the price, but it costs £400 more for every installation you complete.

Now add a profit target. Say each installation brings £1,500 in gross profit, selling and surveying cost £500, and you want to keep £300. That leaves £700 to spend on leads for each installation.

  • Supplier A: the most you could pay per lead is £21 (£700 at a 3% rate). At £30 a lead, you lose money.
  • Supplier B: the most you could pay per lead is £70 (£700 at a 10% rate). At £60 a lead, you stay in profit.

How can you use this to compare suppliers and advertising channels?

Treat every supplier and every advertising channel as its own source with its own numbers, and judge each one on cost per completed installation.

  • Track every lead from the source to a completed installation
  • Ask suppliers for results by stage, not just a price per lead
  • Test a small batch before you scale up
  • Review the numbers regularly, because conversion rates change

We sell leads ourselves, so check any supplier, including us, against your own numbers. If you would like help working out yours, tell us about your business and we will show you what leads could cost.

Boost sales and profitability today!

Find out how many leads we could generate for your business, how many will convert to
customers and how much each lead will cost. Giving you an ROI before you decide to go ahead.

Get Leads Today